Results 2010
WWTP Houtrust


Flow

65.424

m3/day


Pollution

Influent PE load

Effluent load (EDL)

 

295.913

10.934

0
600.000
1.200.000


Results removed pollutions

92,5%


total

76,7%


total

81,7%


total

96,3%


total

27.969

kg/day

2.383

kg/day

345

kg/day

96,3

%

COD removed

TN removed

TP removed

PE yield


Sludge production (including grit)

18.356

tons